Uncategorized

Labor Day 2019

As a reminder, our shuttle bus services will not be running on Monday, September 2, 2019 in observance of Labor Day.

UConn Stamford: NEW CTtransit Connector Route Announced

UConn Transportation Services is excited to announce that CTtransit will provide public bus service between the UConn Stamford campus and the Stamford Transportation Center, which will replace the shuttle bus service previously provided by the University.

 

Beginning August 26, CTtransit offers convenient transit bus service between the UConn Stamford campus and the Stamford Transportation Center via Route 355 (The UConn Stamford Connector). The 355 service operates weekdays, with the first trip departing the Transportation Center at 7:00am followed by trips every half hour throughout the day. The last trip departing the UConn campus in the evening at 10:15pm returns to the Transportation Center for 10:25pm. Route 355 operates on UConn class days during the fall and spring semesters only. The Connector will not operate if campus closes for weather events.

 

A CTtransit branded bus will be used when the service begins.  The bus will eventually be rebranded in an UConn design.

 

Buses on the Route 355 serve three stops: The Transportation Center Bay “A”, Washington & Main at the University’s residence (900 Washington Boulevard, Northbound & Southbound), and the bus stop on Franklin Street adjacent to the UConn campus.

 

Those arriving at the Stamford Transportation Center should board buses displaying the designation sign, “355 UConn Stamford,” for service to the UConn Stamford campus.  Those departing campus should board buses with the destination, “355 Stamford Transportation Center”, for service back to the station. UConn faculty and staff will be required to present their UConn IDs to the driver when boarding to receive service at no charge. UConn students will be required to present both their UConn IDs and current U-Passes for free service.

 

The public fare for the local route service is $1.75 for a two-hour pass.

 

CTtransit service to the UConn Stamford campus is also provided by the following routes:

313 West Broad Street

  • Operates daily between Stamford Transportation Center and Stamford’s West End.
  • Departs Transportation Center Lane B
  • Buses stop on Broad Street at UConn (outbound) and Washington Blvd. & Whitaker Place (inbound)

 

335 Washington Boulevard

  • Operates weekdays only between the Stamford Transportation Center and Stamford’s Bulls Head district via Washington Boulevard.
  • Departs Transportation Center Lane D
  • Buses stop on Washington Blvd. at UConn (outbound) and Washington Blvd. & Whitaker Place (inbound)

 

336 Long Ridge Road

  • Operates weekdays & Saturdays between the Stamford Transportation Center, Stamford’s Westover district, and North Stamford via Atlantic Square.
  • Departs Transportation Center Lane D
  • Buses stop on Broad Street at UConn (outbound) and Washington Blvd. & Whitaker Place (inbound)

 

Passengers are encouraged to sign up for CTtransit alerts at https://www.cttransit.com/news/get-alerts-email-subscribe, where they can select the routes (including 355) about which they wish to receive notifications.

 

Link for 355 schedule and map https://www.cttransit.com/schedules?combine_route_name_no=UConn%20Stamford%20Connector

 

June 13th – Regular Shuttle Service Resumed

The work to repave Hillside Rd between its Jim Calhoun and Gilbert Rd intersections was completed ahead of schedule.

The regular service hours for the Storrs fixed-route shuttle have resumed.

Today’s service (Thursday, June 13th) will continue until 7:00 PM in accordance with our regular schedule.

Thank you for your patience.

June 10th-14th – Shuttle Service Ends at 5:30 PM

Fixed route Shuttle Service on the Storrs campus will end at 5:30 PM next week (Monday – Friday; June 10th-14th). The Accessible Van Service (AVS) will continue to operate normally.

The early suspension of the shuttle service is necessary to accommodate the nightly (6:00 PM – 2:00 AM) construction work required to repave Hillside Road between its Jim Calhoun Way and Gilbert Road intersections.

This section of Hillside will be closed to all traffic during these nightly work periods. 

August 1st – Closures of Lots L, X, and N

To accommodate the Northwest Science Quadrant development scheduled for January 2019, there are a number of changes to Storrs campus parking and shuttle services that will become effective on August 1, 2019. To see these changes, a concise summary of the parking and shuttle schedule changes for the 2019 fall semester is available on the Parking Services website.